Saturday, December 20, 2008

Sanding the Interior, Drilling for Footbraces and End Pours

In anticipation of fitting the deck, today we sanded out the rough edges on the interior of the boat. Then we drilled holes for the foot braces. This involved putting boat on the floor and having Rick sit in it. It seems pretty solid. After laying strips of fiberglass where the foot rails will go, we poured thickened epoxy into the ends. About 1.5 hours work.



Total time to date: 29.5 hours.

No comments: