skip to main | skip to sidebar

Detroit Kayaking

A blog to record my kayaking trips on the Detroit River and elsewhere

Friday, December 5, 2008

Fitting bulkheads and fairing the hull


Tonight we put in the bulkheads and aligned the hull. Not much progress to the naked eye but a solid 2 hours of work as the bulkheads required substantial trimming and the hull is ready to be fixed solid with epoxy and fiberglass.


Total construction time: 11 hours.
Posted by Andrew W at 12:14 AM

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Blog Archive

  • ►  2010 (2)
    • ►  January (2)
  • ►  2009 (30)
    • ►  April (2)
    • ►  March (4)
    • ►  February (3)
    • ►  January (21)
  • ▼  2008 (24)
    • ▼  December (18)
      • Cutting Out the Hatches and Using All Our Clamps
      • In the News
      • Glassing the Deck
      • Trimming the Deck
      • Attaching the Deck
      • Finishing the End Pours and Tidying Up
      • Sanding the Interior, Drilling for Footbraces and ...
      • Planing the Shear Clamps
      • Epoxy and a Photo Shoot
      • Glassing the Hull
      • Sanding Is Fun
      • Inside Is Done
      • More Glassing
      • First Fiberglass Goes On
      • Fitting bulkheads and fairing the hull
      • Looks Like a Boat
      • Taking Shape
      • First Blood
    • ►  November (2)
    • ►  October (4)

About Me

My photo
Andrew W
View my complete profile
 

Visitors to this page

Locations of visitors to this page