Tonight we wet sanded the second coat of varnish, sanded the rear hatch cover, applied more epoxy to the front hatch cover (it is having a fabric patch applied under fiberglass so more epoxy is need on the glass), and applied a third coat of varnish to the bottom of the boat and the first coat to the rear hatch cover. About an hours work with a 45 minute break to allow the laquer thinner (used to wipe it down before the varnishing) to evaporate fully.
Total Construction Time: 59.5 hours.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment